Foster Wheeler Design Practice – Tài Liệu Mới – chia sẻ ebook- download free

Tài Liệu Mới - chia sẻ ebook- download free

Cùng xây dựng cách mạng công nghiệp 4.0

[wpdreams_ajaxsearchpro id=1]

Foster Wheeler Design Practice


Video đang hot


BẤM ĐỂ XEMFOSTER WHEELER ENERGY LTD INDEX
Process Standards
Offsites – Pressure Storage of Equilibrium Liquids 0 Withdrawn
REFERENCE TITLE
D – Process Engineering
Process Std 1001 Process Std 1002 Process Std 1003 Process Std 1004 Process Std 1005 Process Std 101 Process Std 102 Process Std 103 Process Std 104 Process Std 105a Process Std 1102 Process Std 1103 Process Std 1103 Att Process Std 1104
Process Std 1105
Utilities – Boiler Feedwater
Utilities – Steam Generation
Utilities – Steam System
Utilities – Gas Turbines
Utilities – Heat Recovery Steam Generators
Vessels – Drums
Tanks and Tank Fittings
Vessels – Tower Internals
Vessels – Reactors
Vessels – Tower Trays
Offsites – Atmospheric Storage Tanks
Offsites – Marine Systems
Offsites – Marine Systems Attachment
Offsites – Refrigerated Storage of Equilibrium
Liquids
Process
Process
Process
Process
Process
Process
Process
Process
Process
1.0
Process
1.1
Std 1201 Std 201 Std 202 Std 204 Std 301 Std 302 Std 306 Std 308 Std 400-
Std 400-
Utilities – Fire Fighting
Fluid Flow Single Phase
Fluid Flow Two Phase
Fluid Flow Liquid Slurries
Heat Transfer – Shell and Tube Heat Exchangers
Heat Transfer – Air Cooled Exchangers
Heat Transfer – Heaters/Furnaces
Heat Transfer – Cooling Towers and Systems
Mechanical Equipment – Pumps General
Mechanical Equipment – Centrifugal Pumps
Process Std 400-1.2
Process Process
Mechanical Equipment – Reciprocating Pumps
Std 400-2. Std 400-3
Mechanical Equipment – Compressors
Mechanical Equipment – Reciprocating
Compressors
Process Std 400-4 Process Std 507 Process Std 508
Process Std 509 Process Std 601
Mechanical Equipment – Drivers
Instrumentation – Distillation Towers
Instrumentation – Heater and Furnace Control
Systems
Instrumentation – Compressors
Safety – Design Philosophy

Date: 10-Jun-05 DATE
REV ACTION
0 New 17-Feb-03
0 Withdrawn 01-Aug-02
0 New 01-Aug-02
0 Withdrawn 01-Aug-02
0 Withdrawn 01-Aug-02
11 Revised 26-Nov-03
10 Withdrawn 13-Sep-02
10 Withdrawn 13-Sep-02
12 Revised 08-Oct-03
10 Withdrawn 13-Sep-02
0 Withdrawn 01-Aug-02
0 Withdrawn 01-Aug-02
0 Withdrawn 01-Aug-02
01-Aug-02 01-Aug-02
0
Withdrawn

0 Withdrawn 01-Aug-02
2 Withdrawn 31-Jul-02
0 Withdrawn 31-Jul-02
0 New 17-Feb-03
10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
31-Jul-02
10

Withdrawn
Revised
11
22-Mar-05

10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
10 Revised 31-Jul-02
10 Withdrawn 31-Jul-02
10 Withdrawn 31-Jul-02
0 Withdrawn 01-Aug-02

Note: * Signifies document has been posted to Quality Net but not yet transmitted in hard copy

Page 1 of 2

REV ACTION DATE
4 Revised 22-Mar-05
10 Withdrawn 02-Aug-02
11 Revised 14-May-04
10 Withdrawn 02-Aug-02
10 Withdrawn 02-Aug-02
10 Withdrawn 02-Aug-02
10 Withdrawn 02-Aug-02
0 New 11-Feb-03
Date: 10-Jun-05

REFERENCE
Process Std 602 Process Std 603
Process Std 604 Process Std 701 Process Std 702 Process Std 703 Process Std 704 Process Std Index

FOSTER WHEELER ENERGY LTD INDEX
Process Standards
TITLE
Safety – Relieving Devices
Safety – Flare Headers and Blowdown Systems
Safety – Flares and Vent Stacks Miscellaneous – Dryers Miscellaneous – Inert Gas Systems Miscellaneous – Mixing Systems Miscellaneous – Steam Jets and Ejectors Process Standards Index

Note: * Signifies document has been posted to Quality Net but not yet transmitted in hard copy

Page 2 of 2

Updated: December 25, 2015 — 7:04 pm
[ajax_load_more post_type="post, page"]
Tailieu4u.com - chia sẻ ebook- download free © 2017 Frontier Theme